Aluminum Connector Front U-Series

USD48,74 (VAT 0%)

Aluminum linkage left or right side. The triple clamp is bolted, bolted connections are supplied. The rivet connection of the central module is included in the scope of delivery.

Delivery time: 14 working days

In stock

SKUEN0212UVERVOR0